A sand mine turned into a Hass orchard
The challenge: exhausted, disturbed land left behind by sand mining.
What we did: rebuilt the planting ground, planned the layout and established grafted Hass trees with a tailored nutrition programme.
The result: land that had no productive use is now a growing avocado orchard.
A lined dam to beat the dry season
The challenge: an orchard dependent on rainfall, exposed to long dry spells.
What we did: designed and excavated an on-farm dam and installed a liner to stop seepage.
The result: stored rainy-season water available to irrigate through the dry months.
A 100-acre integrated farm, built in phases
The challenge: developing a large farm step by step without over-stretching cash flow.
What we did: phased orchard establishment with water infrastructure, supported by complementary enterprises including an apiary.
The result: an orchard growing in manageable phases, with infrastructure in place for the next stage.
Raising standards across a cooperative
The challenge: many member farmers, few trained extension workers.
What we did: farm visits to member orchards and training for the cooperative's own extension workers.
The result: better advice reaching farmers between our visits.